• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
  • Home
  • Allowances
  • Expected DA
  • CSD
  • DOPT
  • Pensioners Issues
  • Privacy Policy

CENTRAL GOVT EMPLOYEES NEWS

Quick updates for CG Staff and CG Pensioners

  • Holiday Homes
  • Holidays
  • Railway Board Orders
  • TA DA Rules

LATEST CENTRAL GOVERNMENT EMPLYOEES NEWS
Central Government Holiday List 2025 - Know the Complete List
55% DA Order for Central Govt Employees wef 01.01.2025 – Finmin Orders 2025
Revised Rates of HRA 27%, 18% and 9% from 01.01.2021
Reimbursement of Child Education Allowance Form PDF

PSLV Launches India’s Multi Wavelength Space Observatory ASTROSAT Successfully

September 28, 2015

PSLV Successfully Launches India’s Multi Wavelength Space Observatory ASTROSAT

In its thirty first flight (PSLV-C30) conducted today (September 28, 2015), India’s Polar Satellite Launch Vehicle successfully launched ASTROSAT, the country’s Multi Wavelength Space Observatory along with six foreign customer satellites into a 644.6 X 651.5 km orbit inclined at an angle of 6 deg to the equator. The achieved orbit is very close to the intended one. This was the thirtieth consecutive success for PSLV.

PSLV was launched today in its heaviest ‘XL’ version with six strap-on motors of the first stage. The launch took place from the First Launch Pad at the Satish Dhawan Space Centre SHAR (SDSC SHAR), Sriharikota, the spaceport of India.

The 320 tonne, 45 m tall PSLV-C30 carrying seven satellites including the 1513 kg ASTROSAT, lifted off at 10:00 Hrs IST. About twenty two minutes after lift-off, ASTROSAT was successfully placed in orbit and separated from the fourth stage of PSLV-C30. The separation of all the six co-passenger satellites was completed in the subsequent three minutes. The seven satellites carried by PSLV-C30 together weighed about 1631 kg at lift-off.

After a 50 hour smooth count down, the 320 ton PSLV-C28 was launched with the ignition of its first stage. The important flight events included the ignition and separation of the strap-ons, separation of the first stage, ignition of the second stage, separation of the payload fairing after the vehicle had cleared the dense atmosphere, second stage separation, third stage ignition and third stage separation, fourth stage ignition and fourth stage cut-off.

Through 30 successful flights during 1994-2015 period, PSLV has launched a total of 84 satellites including the seven satellites successfully launched today. The vehicle has repeatedly proved its reliability and versatility by successfully launching satellites into a variety of orbits including polar Sun Synchronous, Geosynchronous Transfer and Low Earth orbits of small inclination thereby emerging as the workhorse launch vehicle of India.

Central Government Holiday List 2025 PDF

So far, 51 satellites have been launched by PSLV for customers from abroad. Today’s launch of six co-passenger satellites by PSLV-C30 was facilitated by Antrix Corporation Limited, the commercial arm of the Indian Space Research Organisation (ISRO), a government of India Company under the Department of Space (DOS).

Soon after its separation from PSLV-C30, the two solar arrays of ASTROSAT were automatically deployed and the Spacecraft Control Centre at the Mission Operations Complex of ISRO Telemetry, Tracking and Command Network (ISTRAC) at Bangalore took control of ASTROSAT.

ASTROSAT is India’s first dedicated multi wavelength space observatory. This scientific satellite mission endeavours for a more detailed understanding of our universe. ASTROSAT is designed to observe the universe in the Visible, Ultraviolet, low and high energy X-ray regions of the electromagnetic spectrum simultaneously with the help of its five payloads.

ASTROSAT was realised by ISRO with the participation of all major astronomy institutions including Inter University Centre for Astronomy and Astrophysics (IUCAA) of Pune, Tata Institute of Fundamental Research (TIFR) at Mumbai, Indian Institute of Astrophysics (IIAP) and Raman Research Institute (RRI) of Bangalore as well as some of the Universities in India and two institutions from Canada and the UK.

In the coming days, ASTROSAT will be brought to the final operational configuration and all its five scientific payloads will be thoroughly tested before the commencement of regular operations.

Today’s successful flight of PSLV further underscores the reliability and versatility of PSLV as well as the robustness of its design

Source: PIB News

ALLOWANCE NEWS

55% DA Order for Central Government Employees wef 1.1.2025 – Finmin Orders 2025

53% DA Order for Central Government Employees wef 1.7.2024 – Finmin Orders 2024

217.8% DA from July 2024 to CPSE Employees for 2007 Pay Scales

44.8% DA from July 2024 to CPSE Employees for 2017 Pay Scales

436.5% DA from July 2024 to CPSEs 1997 Pay Scales

GDS Latest News

GDS Online Engagement Schedule, July-2024 Schedule

July 15, 2024 By admin

46% DA to GDS Employees from 01.07.2023

November 7, 2023 By admin

GDS Online Engagement Schedule-II (July) 2023

July 15, 2023 By admin

India Post GDS Apply Online 2023 Last Date Extended to 23 June 2023

June 17, 2023 By admin

Special Training Module on Social Media for Government Employees

May 9, 2023 By admin

Primary Sidebar




Holiday List 2025 in India

Central Govt Holiday List 2025 PDF
Bank Holiday List 2025 India
CGHS Holiday List 2025
ESIC Holiday List 2025
Indian Customs Office Holiday List 2025
Indian Passport Office Holidays 2025
India Post Holiday List 2025 PDF
Indian Railway Board Holiday List 2025
LIC Office Holiday List 2025

STATE GOVERNMENT HOLIDAYS 2025

Andhra Pradesh Govt Holiday List 2025 PDF
Assam Govt Holiday List 2025 PDF
Bihar Govt Holiday List 2025 PDF
Chhattisgarh Govt Holiday List 2025 PDF
Delhi Govt Holiday List 2025 PDF
Gujarat Govt Holiday List 2025 PDF
Haryana Govt Holiday List 2025 PDF
Himachal Pradesh Govt Holiday List 2025 PDF
Jharkhand Govt Holiday List 2025 PDF
Karnataka Govt Holiday List 2025 PDF
Kerala Govt Holiday List 2025 PDF
Madhya Pradesh Govt Holiday List 2025 PDF
Maharashtra Govt Holiday List 2025 PDF
Manipur Govt Holiday List 2024 PDF
Meghalaya Govt Holiday List 2025 PDF
Mizoram Govt Holiday List 2025 PDF
Nagaland Govt Holiday List 2025 PDF
Odisha Govt Holiday List 2025 PDF
Punjab Govt Holiday List 2025 PDF
Rajasthan Govt Holiday List 2025 PDF
Sikkim Govt Holiday List 2025 PDF
Tamil Nadu Govt Holiday List 2025 PDF
Telangana Govt Holiday List 2025 PDF
Tripura Govt Holiday List 2025 PDF
Uttar Pradesh Govt Holiday List 2025 PDF
Uttarakhand Govt Holiday List 2025 PDF
West Bengal Govt Holiday List 2025 PDF




Central Govt Employees News

8th Pay Commission Latest News
7th CPC Pay Matrix Table for Central Government Employees
7th CPC Pay Matrix Table for Defence Employees
7th Pay Commission AICPIN
7th Pay Commission Children Education Allowance
7th CPC House Rent Allowance
7th CPC Advances to Central Government Employees
Central Government Employees Festival Advance
DA Chart for CG Employees and Pensioners
CGHS New Rate List in India
CGHS Subscription as per 7th CPC for Central Govt Employees
CGHS Hospital List India PDF
ECHS Empanelled Hospitals and Nursing Homes
CSD Price List of Air Conditioner(ac)
Holiday Homes List in India
List of Kendriya Vidyalaya in India PDF
KVS Holiday List 2025-26 PDF
50 New Kendriya Vidyalaya in India
Sainik School List in India
Army Holiday Home in India State wise
List of Railway Holiday Homes
Railway Board Orders

Copyright © 2025 - Central Govt Employees News - cgstaffportal.in - Log in