Scheme of Filling up of Non-gazetted Posts and Classification of Posts – Railway Board
Revised classification and mode of filling up of non-gazetted posts – Scheme for filling up of vacancies after 31.12.2016- Clarification Reg – RBE 141/2019
RBE No. 141/2019
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.E(NG)l/2008/PM1/15Vol.III
New Delhi, dated August 28, 2019
The General Managers,
All Zonal Railways &
Production Units etc.
(as per standard mailing list)
Sub: Revised classification and mode of filling up of non-gazetted posts – Scheme for filling up of vacancies after 31.12.2016- Clarification Reg.
Ref.: Dy.CPO(WS)/ICF’s letter No.PB/S2/2/90/SSE dated 10.09.2018
As the Railway Administration are aware, consequent to implementation of 6th CPC recommendations and merger of grades, instructions were issued vide Board’s letter of even number dated 03.09.2009 regarding scheme of filling up of non-gazetted posts and classification of posts. This scheme has been extended from time to time and was last extended vide letter dated 03.03.2017, wherein it was inter-alia stipulated that till such time instructions for benchmark for regular promotion are issued, after receipt of clarification from DoP&T, the existing methodology and benchmark for promotion as enumerated in Board’s letter dated 03.09.2009 may continue till further orders.
In the backdrop of the aforesaid provisions, clarification has been sought from Railway Board by ICF regarding filling up the post of Section Engineer in GP Rs.4600, the classification of which stands as “suitability with prescribed benchmark” as per instructions contained in letter dated 03.09.2009 ibid read with letter dated 03.03 .2017 ibid. Specific clarification has been sought regarding the period of assessment of vacancies i.e. whether the vacancy assessment period should be taken as 15 months, as in
the case of selection post, or 6 months as in the case of non-selection post (which has now been changed to one year vide Board’s letter No. E(NG)I/2018/PMl/65 dated 07.12.2018).
The matter has been examined and it is clarified that as the mode of promotion prescribed in Board’s letter dated 03.09.2009, has been extended till further orders vide letter dated 03.03.2017, and as per these instructions the vacancies of Section Engineer in GP Rs.4600 is to be filled in by the process of “suitability with prescribed benchmark”, the vacancy assessment period for filling up these posts should appropriately be one year as per instructions dated 07.12.2018 ibid, applicable for non-selection posts.
Promotions in other categories are also to be regulated accordingly.
Please acknowledge receipt. Hindi version will follow.
This disposes of ICF’s letter No. PB/S2/2/90/SSE dated 10.09.2018 on the above subject.
Jt. Director/Estt.(N)
Railway Board
Source: AIRF
READ ALSO:
- Ad-hoc Appointments in Group-B and A Posts – DoPT Orders 2023 December 15, 2023Read more…
- Revision of Minimum Qualifying Service Pay Levels for Promotion as per 7th CPC Recommendations September 21, 2022Read more…
- Adventure Sports Schedule for Central Government Employee 2021-22 August 11, 2021Read more…
- Latest and New Clarification on MACP Scheme Central Government Civil Employees March 28, 2021Read more…
- Clarification on MACP Scheme Promotion Earned from Inspector Posts (IP) cadre to Asstt. Superintendent of Posts (ASP) cadre February 11, 2021Read more…
- Clarification on Reckoning of Re-promotion of an Employee fixed under FR 22(1)(a)(2) for the purpose of Financial Upgradation under MACPS September 28, 2020Read more…
- Doubts and Clarification on Scheme of Adventure Sports Programmes for Central Government Employee August 26, 2020Read more…
- Selection for promotion to the posts of Chief Office Superintendent and non-selection process for filling vacancies of Office Superintendent in Security Department on Zonal Railways July 5, 2020Read more…
- Clarification-New Incentive Structure of PLI/RPLI Engagement of Development Officer and Agents June 27, 2020Read more…
- New Promotional and Incentive Structure of Postal Life Insurance (PLI) and Rural Postal Life Insurance (RPLI) June 21, 2020Read more…